Delivering engineering excellence that sets the standard for others to follow
Get in touchOur company structure is built to deliver a first-class service to our partnerships across the South East region. FLR team aim to build lasting relationships with our clients based delivering your projects with pride honesty and integrity.
Our vision is to build our company to be the most innovative and quality driven MEP Engineering Contractors in the South East. Our teams comprise of highly qualified, experienced, and motivated Mechanical & Electrical professionals, who are committed to providing an industry leading service to all our valued clients.
"Design "Innovate" Engineer" Deliver"
FLR Mechanical are a vibrant and dynamic integrated building services company who offer a full range of Mechanical and electrical services and are specialists in design, installation, and management services. With over 30 years’ experience, the FLR team are committed to providing industry leading engineering excellence that set the standards for others to follow. Our team of experts are committed to providing high quality engineering solutions to suit our clients’ needs with no compromise on quality.
Design, BIM Modelling, Mechanical Services, Electrical Services, Public Health Services, Hot & Cold-Water Services, Energy Technologies, Air Conditioning & Ventilation, Energy Management, Energy consultation, CSH & Breeam Compliance, Renewable energy solutions, Building management systems, Smoke control and ventilation systems, Off site fabrication facilities, Utility cupboard and riser Modular solutions.
At FLR our policy is to consider the health and safety of all who could be affected by our company’s operations. We prioritise health & safety for our staff, specialist subcontractors and the staff of our clients, consistently over the duration of our projects. We constantly monitor and communicate our health & safety policy to our employees on our construction sites and at our (site) office locations.
1. FLR Mechanical LTD acknowledge and accept our legal responsibilities for securing the health, safety, and welfare of all its employees, of specialist sub-contractors working on its behalf and all others affected by their activities. Our policy will be regularly reviewed and revised to take account of any new hazards, technologies, or improved methods of control, as well as changes in legislation or the organisational structure. We will ensure our Health and safety remains relevant to the nature, size and purpose of our business and all revisions will be communicated to all persons affected by any of the changes.
2. FLR Mechanical LTD recognises and accepts the general duties imposed upon the company as an employer under the Health and Safety at Work Act and subsequent health and safety regulations appertaining to its operation.
3. FLR Mechanical LTD will do all that is reasonably practicable to provide and maintain:
4. FLR Mechanical LTD will carry out a regular review of this policy to ensure that these standards of health and safety are continually monitored and maintained.
Below are just some the latest projects that we have undertook. By listening to our customer’s ambition, we are here to deliver the best outcome based on their needs and requirements.
If you have any questions about our services, or would like to discuss about a project in mind, please contact us using the following links below.
This project, in the heart of Southwark, replaces two commercial buildings with a high-end residential block of 53 apartments and commercial space at street level. Eight of the apartments will be for rent to local people and two for shared ownership.
This project in vibrant Westminster is a newly constructed 58-bedroom Hotel with five luxury flats with their own independent entrance. FLR delivered the full mechanical package together with the critical life safety systems.
The FLR team have installed a temporary hot water back up system which involved design and install of a packaged plantroom to the roof, installation of HWS cylinders to the basement and install of 8" gas supply pipework from basement to roof. All works were carried out while the hotel was upwards of 90% capacity and all services maintained throughout.